Mobile QR Code QR CODE
Export citation EndNote
Title Initial Stiffness of Beam Column Joints of PCS Structural Systems
Authors 박순규 ; 김무경
Page pp.271-282
ISSN 1229-5515
Keywords PCS 구조 시스템 ; 접합부 강성 ; 초기 강성 ; 초기 변형 ; 볼트 긴장력 PCS structural system ; stiffness of joint ; initial stiffness ; initial imperfection ; pretension to the bolts
Abstract Specific joint devices composed of end-plates and through bolts are under evelopment to assemble steel beams to PC columns efficiently by dry construction method for the PCS structural system, of which major structural components are precast concrete columns and steel beams. Seismic performance of the joint devices had been evaluated by experimental tests in the previous studies and it was showed that all the performance requirements regarding to strength deterioration, stiffness degradation and energy dissipation capacity were satisfied to the criteria of ACI requirements, but the initial stiffness was not.In order to find out possible causes of the insufficient rigidity of the joint devices and provide the proper measures to improve the performance of the joint accordingly, numerical analyses were carried out by using ABAQUS. Parameters, such as thickness of neoprene pad, conditions of surface between PC column and end-plate, magnitude of pretension forces of through bolts, stiffness of end-plate were taken into consideration. As the result, it was found that the rigidity of the PCS system was negatively affected by the magnitude of initial gaps between PC columns and end-plates, and insufficient stiffness of neoprene fillers and end plates. In order to improve the initial stiffness performance of the joints, measures such as increase of the magnitude of pretension forces on through bolts and increase of the stiffness of end-plate by reducing the bolt pitch and providing adequate stiffeners are recommended.